Going up . . .
Work continues apace on our extension. Last week the builders dug a big hole in the ground for a "soakaway", to take rainwater from the extension roof (apparently our Thames Water drain can't cope with this extra water). The roof is on and the Velux windows installed.
Next week it's the window and patio doors.